Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for renovations and repairs to existing Engineering Shops, Chapel, Morgue, Post 7 Security and adjacent interior and exterior spaces as part of the Ground Floor flood mitigation activities; and including alteration/expansion of associated mechanical, electrical, plumbing, and elevator components as required by drawings and specifications.
Provide and coordinate all necessary work and products meeting the requirements associated with all applicable specification sections and drawings to produce a system complete, functional and ready for the purpose intended.